Road work: May 31-June 4
The Pennsylvania Department of Transportation announces the following road work this week, but be advised that road work schedules may change as needed during COVID-19 mitigation or due to changes in the weather:
Carbon County
• Jim Thorpe, West Broadway Avenue inspection between High Street and Hill Road, 9 a.m. to 3 p.m. on Tuesday.
• Packer Township, Plane Road pothole patching between Route 93 and Quakake Road, 7 a.m. to 3 p.m. Tuesday through Friday.
Lehigh County
• Various municipalities: I-78 construction between Exit 49 (Route 100) and Exit 54 (Route 222), 9 p.m. to 6 a.m. Tuesday through Friday.
• South Whitehall/Whitehall Townships: Route 22 Interchanges various ramp closures at the interchanges with Cedar Crest Blvd., 15th Street, and MacArthur Road from 7 p.m. to 6 a.m. Tuesday through Friday.
• Whitehall Township, Route 145/MacArthur Road paving between Route 22 and Route 329, 9 p.m. to 3 p.m. Tuesday through Sept. 13, 2022.
• Whitehall Township, Route 145/MacArthur Road pothole patching between Route 22 and Tilghman Street, 8 a.m. to 2 p.m. Tuesday through Friday.
• South Whitehall Township, Cedar Crest Blvd. drainage between Cedar Creek and Route 22, 9 a.m. to 2 p.m. Tuesday through Friday.
• Hanover Township, Route 22 boring work between North Irving Street and North Dauphin Street, 8 a.m. to 4 p.m. Tuesday through Friday.
Monroe County
• Stroud Township, I-80 surveying between Exit 307 and Exit 302 (Route 33 to Route 209), 8 p.m. to 6 a.m. Tuesday through Friday.
• Polk Township, Route 534 shoulder work/widening between Route 209 and Carbon County Line, 9 a.m. to 3 p.m. Tuesday through Friday.
• Stroud Township, I-80 Ramps crack sealing between Exit 303 and Exit 305 (Route 209), 9 a.m. to 3 p.m. Tuesday through Friday.
Northampton County
• Lower Nazareth Township, Route 33/Route 248 Interchange and Route 33/Hecktown Road Interchange ramps will be closed and detoured for pavement rehabilitation work from 8 p.m. to 6 a.m. Tuesday through Friday.
• Plainfield/Palmer, Route 33 road work between Route 22 and Route 512, 9 a.m. to 2 p.m. Tuesday through Thursday.
• Bethlehem Township, Route 33 shoulder restriction for core boring work between William Penn Highway and Route 22, 8 a.m. to 4 p.m. Tuesday through Friday.
• Wind Gap Borough/Plainfield Township, Route 33 roadway reflector installation between Monroe County Line and Belfast Exit, 9 p.m. to 6 a.m. Tuesday through Thursday.
Schuylkill County
• Gilberton borough construction running to Main Street will be closed and detoured at any time of day from Tuesday until June 21, 2022.