Log In


Reset Password

Road work

The Pennsylvania Department of Transportation announces the following road work this week, but be advised that road work schedules may change as needed based on the weather:

Lehigh County

• Upper Macungie, South Whitehall Township, City of Allentown: Route 22 construction between I-78 and 15th Street, 7 p.m. to 6 a.m. Monday through Friday.

• Whitehall Township: Route 22 milling and paving between 15th Street and Route 145/MacArthur Road, 7 p.m. to 6 a.m. Monday through Friday.

• Salisbury Township/Allentown: I-78 inspection between Exit 55 and Exit 57 (Lehigh Street), 9 a.m. to 3 p.m. on Monday and Tuesday.

• Whitehall Township: Lehigh Street inspection between Route 145 (MacArthur Road) and Northampton County Line, 8 a.m. to 3 p.m. on Thursday.

• City of Allentown: I-78 inspection between Exit 57 and Exit 60 (Route 309), 9 a.m. to 3 p.m. Tuesday through Thursday.

• Washington Township: Mountain Road brush cutting between Brown Street and Route 873, 8 a.m. to 2 p.m. Monday through Friday.

• Whitehall: Route 22 litter removal between I-78 and Airport Road, 9 a.m. to 2 p.m. Monday through Friday.

• Salisbury: Route 145 crack sealing between Route 309 and Tilghman Street, 8 a.m. to 2 p.m. Monday through Friday.

• Weisenberg Township: I-78 highway beautification between Exit 45 and Exit 49 (Route 100), 9 a.m. to 2 p.m. Monday through Friday.

Northampton County

• Lower Nazareth Township: construction at Route 33/Route 248 and Route 33/Hecktown Road Interchanges, ramps will be closed and detoured at both interchanges for pavement rehabilitation work, detours will be 8 p.m. to 6 a.m. from Monday to Thursday. Details are below for any detours and closures:

Monday: Route 248 to Route 33 South

Tuesday: Route 33 South to Route 248

Wednesday: Route 33 North to Route 248

Thursday: Route 248 to Route 33 North

Route 33/PA 248 Interchange:

• Route 248 to Route 33 South: Use Route 248 North to Main Street (Tatamy) Exit to Route 248 South

• Route 33 North to Route 248: Continue on Route 248 North to Main Street (Tatamy) to Route 33 South to Route 248

• Route 33 South to Route 248: Continue on Route 33 South to Hecktown Road Exit to Route 33 North to Route 248

• Route 248 to Route 33 North: Use Route 248 Ramp to Route 33 South to Hecktown Road Exit to Route 33 North

Route 33/Hecktown Road Interchange:

• Hecktown Road to Route 33 South: Use Hecktown Ramp to Route 33 North to Route 248 Exit to Route 33 South

• Route 33 South to Hecktown Road: Continue on Route 33 South to Route 22 Interchange to Route 33 North Exit to Hecktown Road

• Route 33 North to Hecktown Road: Continue on Route 33 North to Route 248 Exit to Route 33 South to Hecktown Road

• Hecktown Road to Route 33 North: Use Hecktown Road Ramp to Route 33 South to Route 22 Interchange to Route 33 North Exit

• City of Easton, Route 33 inspection between Freemansburg Ave and I-78, 8 a.m. to 3 p.m. on Saturday through Nov. 9.

• Lehigh Township, Route 248 drainage between Timberline Road and Carbon County line, 9 a.m. to 2 p.m. Monday through Friday.

Schuylkill County

• Frackville Borough, I-81 at Exit 124 (Route 61) bridge repair from 7 a.m. to 3 p.m. beginning on Monday and running through Nov. 18.

• Frailey Township, I-81 pothole patching between Exit 107 (Route 209) and Exit 112 (Route 25), 7 a.m. to 3 p.m. Monday through Thursday.

• Porter Township, Route 209 pothole patching between Dauphin County Line and Route 325, 7 a.m. to 3 p.m. Monday through Friday.

• City of Pottsville, Route 61 intersections: As part of the ongoing Route 61 Signals Project, left turns will be restriction at the intersections of Route 61/Route 209 to facilitate construction work. Detour will utilize Norwegian Street to Center Street. This restriction will take place from Monday to Nov 22.