Road work
Carbon County
• Kidder Township: I-80 Ramps at Exit 274 pothole patching, 7 a.m. to 3 p.m. on Wednesday and Thursday.
• Banks Township: Cigar Plant Road drainage between Chestnut Street and Route 93, 7 a.m. to 3 p.m. on Tuesday.
• East Penn/Bowmanstown: Route 895 crack sealing between Route 248 and Schuylkill County line, 7 a.m. to 3 p.m. through Friday; Ben Salem/Mahoning Mountain crack sealing between county line and Route 443, 7 a.m. to 3 p.m. through Friday.
Lehigh County
• Whitehall Township: Route 22 milling and paving between 15th Street and Route 145/MacArthur Road, 7 p.m. to 6 a.m. Monday through Friday; Route 145 drainage between Clearview Road and Neffs Laury Road, 8 a.m. to 2 p.m. through Friday.
• Upper Saucon Township: Church View Road bridge repair between Limeport Pike and Hill Road, 8 a.m. to 2 p.m. through Friday.
• Weisenburg: Route 863 paving between I-78 and Route 143, 8 a.m. to 2 p.m. through Friday.
• Allentown: Chestnut Street crack sealing between Route 29 and Route 145, 8 a.m. to 2 p.m. through Friday.
• Salisbury: Route 145 crack sealing between Route 309 and Tilghman Street, 8 a.m. to 2 p.m. through Friday.
• Upper Macungie Township: I-78 crack sealing between Exit 49 (Route 100) and Exit 45 (Route 863), midnight to 8 a.m. through Friday.
Monroe County
• Stroudsburg Township: Cherry Lane Road lane restriction between Route 191 and Hallet Road, 9 a.m. to 3 p.m. through Friday; Route 191 base repair between Route 611 and County Line, 9 a.m. to 3 p.m. on Tuesday.
Northampton County
• Lower Nazareth Township: Route 33/Route 248 construction, 8 p.m. to 6 a.m. Monday through Friday there will be closures and detours near Hecktown Road and Route 33 North and South.
• Williams Township/Lower Saucon: I-78 pothole patching between Exit 75 and Exit 67, midnight to 8 a.m. through Friday.
• Lehigh Township: Walnut Drive drainage between Lehigh Drive and Elm Road, 9 a.m. to 2 p.m. on Tuesday.
Schuylkill County
• Butler Township: Route 61 drainage between Ashland Borough and Frackville Borough, 7 a.m. to 3 p.m. Monday through Friday.
• Pottsville City/St. Clair: Route 61 pothole patching between Pottsville City and St. Clair Borough, 7 a.m. to 3 p.m. through Friday.