Log In


Reset Password

Road work this week

The Pennsylvania Department of Transportation announced the following road work this week:

Carbon County

• Kidder Township, Route 534/Hickory Run Road crack sealing between Route 903 and Route 940, Wednesday through Friday 7 a.m. to 3 p.m.

• Kidder Township, Route 940 crack sealing between Route 534 and Monroe County line, Monday and Tuesday 7 a.m. to 3 p.m.

Lehigh County

• Upper Macungie, Lower Macungie and South Whitehall Townships, Interstate 78 construction between Exit 49 (PA 100) and Exit 54 (US 222), Monday through Saturday 8 p.m. to 6 a.m.

Northampton County

• Various municipalities, Route 33 between Route 22 and Main Street (Tatamy), Monday through Friday 9 p.m. to 6 a.m.

• Bethlehem Township, Route 33 South inspection between Freemansburg Avenue and Interstate 78, Monday and Tuesday 8 a.m. to 2:30 p.m.

• Williams Township, Route 611/South Delaware Drive pothole patching between Cedarville Road and Browns Drive, Friday 8 a.m. to 2 p.m.

• Williams, Bethlehem, and Lower Saucon Townships, Interstate 78 West litter removal between Exit 75 (To Route 611) and Exit 60 (Route 309), Monday and Tuesday a.m. to 2 p.m.

• Williams, Bethlehem, and Lower Saucon Townships, Interstate 78 East litter removal between Exit 60 (Route 309) and Exit 75 (To Route 611), Wednesday and Thursday 8 a.m. to 2 p.m.

• City of Bethlehem and Bethlehem Township, William Penn Highway/Easton Avenue crack sealing between Stefko Blvd and Hope Road, Friday 8 a.m. to 2 p.m.

• Lehigh Township, Walnut Drive drainage between Magnolia Drive and Sycamore Drive, Wednesday through Friday 8 a.m. to 2 p.m.

• Plainfield Township, Route 33 North inspection between Route 191 and Belfast Exit, Tuesday 8 a.m. to 2 p.m.

Monroe County

• East Stroudsburg Borough, Interstate 80 at Exit 308 (Prospect Avenue) construction, Tuesday through Thursday 8 p.m. to 5 a.m.

• Middle Smithfield Township, Route 209 crack sealing between Interstate 80 and County Line, Monday through Friday 7 a.m. to 3 p.m.

• Hamilton and Stroud Townships, Route 33 North crack sealing between Route 209 and Route 611, Tuesday through Thursday 7 a.m. to 3 p.m.

• Chestnuthill Township, Lower Camp Akiba/Hillside Road crack sealing between Route 715 and Neola Road, Monday through Friday 7 a.m. to 3 p.m.

Schuylkill County

• New Castle Township, Interstate 81 South between Exit 119 (Highridge Park Road) and Exit 124 (Route 61), Tuesday 7:30 a.m. to 2 p.m.

• Kline, Delano and Mahanoy Townships, Interstate 81 South crack sealing between Exit 131 (Route 54) and Exit 138 (Route 309), Tuesday through Thursday 7 a.m. to 3 p.m.