Log In


Reset Password

Road work this week

The Pennsylvania Department of Transportation announced the following road work this week:

Carbon County

• Kidder Township: Route 534 milling and paving between River Road/Tannery Road

and Route 903, 7 a.m.. To 3 p.m. Thursday and Friday.

• Kidder Township/ East Side Borough: river Road milling and paving between Route 534 and PA 940, 7 a.m. to 3 p.m. Monday through Wednesday.

• Palmerton Borough: Fireline Road, drainage between 3rd Street and Palmerton High School, 7 a.m. to 3 p.m. Monday through Thursday.

• Mahoning Township: Packerton Drive drainage between Beaver Run and Pine Hollow, 7 a.m. to 3 p.m. Wednesday though Friday.

Lehigh County

• Various municipalities: Interstate 78 construction between Exit 55 (Route 29) and Northampton County line, 9 p.m. to 6 a.m. Monday through Saturday.

• Upper Macungie, Lower Macungie and South Whitehall Townships: Interstate 78

construction between Exit 49 (Route 100) and Exit 54 Route 222), 8 p.m. to 6 a.m. Sunday through Friday.

• Various municipalities: Interstate 78, sweeping between Lehigh County line and

Northampton County line, 9 a.m. To 2 p.m. Monday through Friday.

• Upper Saucon Township: East Passer Road Drainage between Route 309 and Bucks

County Line, 9 a.m. to 2 p.m. Monday through Friday.

• Upper/Lower Macungie Townships: Trexlertown Road pothole patching between

Spring Creek Road and Route 222, 7 a.m. to 3 p.m. Wednesday through

Friday.

• Upper Macungie Township: Schantz Road drainage between Newtown Road and

Adams Road, 7 a.m. to 3 p.m. Monday and Tuesday.

Northampton County

• Bethlehem Township: Route 22 construction between routes 512 and PA 33, 9 p.m. to 6 a.m.

Friday through Thursday.

• Various municipalities: Route 33 between Route 22 and Main Street (Tatamy), 9 p.m. to 6 p.m. Friday through Monday

• Bethlehem: Route 378/Wyandotte Street utility work between Broadway and 4th

Street, 8:45 a.m. to 3:15 p.m.

• Bethlehem: PA 378/Wyandotte Street utility work between Summit Street and

Sassafras Street, 8 p.m. to 6 a.m. through Wednesday.

Monroe County

• Tobyhanna Township: Route 115 Shoulder Work/Widening between Interstate 80

and Route 940, 9 a.m. to 3 p.m. Monday through Friday.

• Multiple townships: Route 209 drainage between PA 33 and Interstate 80, 9 a.m.

to 3 p.m. Tuesday and Wednesday.

• Multiple townships: Route 33 drainage between routes 209 and 611, 9 a.m. to

3 p.m. Thursday.

• Tunkhannock Township: Interstate 80 Ramps at Exit 293 (I-380) bridge repair

between Interstate 80 and Interstate 380, 9 a.m.. To 3 p.m. Monday through

Thursday.

• Pocono Township: Interstate 80 West construction between Exit 293 (I-380) and

Exit 298 (Scotrun), 7 a.m. to 3 p.m. Monday through Friday.

• Pocono Township: Interstate 80 West construction between Exit 298 (Scotrun)

and Exit 299 (PA 715), 9 p.m. to 6 a.m. Tuesday through Friday.

Schuylkill County

• City of Pottsville: Route 209/Market Street pothole patching between 2nd Street and

23rd Street, 7 a.m. to 3 p.m. Monday through Friday.