Log In


Reset Password

Road work this week

The Pennsylvania Department of Transportation announces the following road work this week, but be advised that road work schedules may change as needed during COVID-19 mitigation or due to changes in the weather:

Carbon County

• Mahoning Township: Route 902 lane restriction between Fritz Valley Road and 12th Street, 7 a.m. to 3 p.m. Monday through Friday.

• Mahoning Township: Route 443/Blakeslee Boulevard pothole patching between Fritz Valley Road and Ashton Road, 7 a.m. to 3 p.m. Monday through Friday.

Lehigh County

• Upper Macungie and South Whitehall townships, City of Allentown: Route 22 construction between I-78 and 15th Street, 7 p.m. to 6 a.m. Tuesday through Friday.

• Whitehall Township: Route 22 milling and paving between 15th Street and Route 145/MacArthur Road, 7 p.m. to 6 a.m. Tuesday through Friday.

• Various townships: I-78 construction between Exit 49 (Route 100) and Exit 54 (Route 222), 9 p.m. to 6 a.m. Monday through Saturday.

• Allentown: I-78 drainage between Exit 59 and Exit 57 (Lehigh Street), 8 a.m. to 2 p.m. Monday through Friday; I-78 highway beautification between Exit 58 and Northampton County line, 8 p.m. to 5 a.m. Monday through Friday; I-78 drainage between Exit 59 and Exit 57, 9 a.m. to 2 p.m. Monday through Friday.

• South Whitehall Township: Route 309 pothole patching between Walbert Avenue and Kernsville Road, 8 a.m. to 2 p.m. Monday through Friday.

• Various townships: I-78 core boring work between Exit 57 (Lehigh Street) and Exit 60 (Route 309), 9 a.m. to 3 p.m.

Monroe County

• Hamilton Township: Route 209 inspection between Rimrock Drive and Metzgar Road, 9 a.m. to 3 p.m. on Monday.

• Tobyhanna Township: I-80 pothole patching between Carbon County line and Exit 293, 9 p.m. to 5 a.m. on Monday and Tuesday; I-80 pothole patching between Exit 293 and Carbon County Line, 9 p.m. to 3 a.m. on Tuesday and Wednesday; I-80 East pothole patching between Carbon County line and Exit 284, 9 a.m. to 3 p.m. Monday through Thursday.

• Multiple townships: Route 611 drainage between Route 33 and Scotrun Avenue, 9 a.m. to 3 p.m. on Monday.

• Hamilton Township: Route 209 drainage between Lesh Road and Route 33, 9 a.m. to 3 p.m. Tuesday through Friday; Route 209 bridge repair between Lesh Road and Route 33, 9 a.m. to 3 p.m. on Monday.

• Multiple townships: Route 33 South pothole patching between Saylorsburg Exit and Northampton County line, 9 a.m. to 3 p.m. Tuesday through Thursday; I-80 Westbound bridge repair between Exit 302 (Route 33) and Exit 299, 9 a.m. to 3 p.m. Tuesday through Thursday; Route 33 South pothole patching between Saylorsburg Exit and Northampton County line, 9 a.m. to 3 p.m. Tuesday through Thursday.

Northampton County

• Lower Nazareth Township: Route 33/Route 248 and Route 33/Hecktown Road Interchange ramps will be closed and detoured for pavement rehabilitation work from Tuesday to Friday.

• Lower Saucon/Williams: I-78 shoulder work westbound between Exit 75 and Exit 71, 9 a.m. to 2 p.m. on Wednesday and Thursday; Route 33 North lane restriction between I-78 and Belfast Exit, midnight to 8 a.m. on Wednesday and Thursday.

• Plainfield Township: Route 33 sweeping between Belfast Exit and Route 512, midnight to 7 a.m. on Monday; Route 33 North sweeping between Route 512 and Monroe County line, midnight to 7 a.m. on Tuesday and Wednesday; Route 33 sweeping between Route 512 and Belfast Exit, midnight to 7 a.m. on Thursday and Friday.

• Palmer/Plainfield Township: Route 33 shoulder restriction between Route 22 and Route 512, 9 a.m. to 2 p.m. Monday through Thursday.

• Various municipalities: I-78 guide rail repair between Exit 60 (Route 309) and Exit 75, 9 a.m. to 3 p.m. beginning Thursday and expected to end Oct. 31.

Schuylkill County

• Rush Township: Route 54 bridge repair between Marian High School Road and Kahler Avenue, hours varying throughout the entire day beginning Monday and expected to end on Dec. 1.