Road work this week
The Pennsylvania Department of Transportation announces the following road work this week, but schedules may change as needed during COVID-19 mitigation or due to changes in the weather:
Carbon County
• East Penn Township, Route 895 crack sealing between Route 248 and Schuylkill County line, 7 a.m. to 3 p.m. Tuesday through Friday.
• Kidder Township, Route 534 brush cutting between River Road and Route 903, 7 a.m. to 3 p.m. Tuesday through Friday.
Lehigh County
• Upper Macungie and South Whitehall Townships, City of Allentown: Route 22 construction between I-78 and 15th Street, 7 p.m. to 6 a.m. Monday through Friday.
• Whitehall Township, Route 22 milling and paving between 15th Street and Route 145/MacArthur Road, 7 p.m. to 6 a.m. Monday through Friday.
• Salisbury Township, I-78 Ramps at Exit 58 (Emmaus Avenue) inspection at 9 a.m. to 3 p.m. on Tuesday and Wednesday.
• Upper Macungie Township, Adams Road bridge repair between Schantz Road and Main Street, 8 a.m. to 2 p.m. Tuesday through Friday.
• Allentown, I-78 shoulder restriction between Exit 49 (Route 100) and Northampton County line, 9 a.m. to 2 p.m. Tuesday through Friday.
• Washington Township, North Whitehall Township, Heidelberg Township, Neff Laurys Road/Church Road/Reservoir Road drainage between Route 145 and Mountain Road, 8 a.m. to 2 p.m. Tuesday through Friday.
Monroe County
• Chestnuthill Township: Jonas Road between routes 715 and 115, brush cutting, starting Tuesday, 9 a.m. to 3 p.m.
Northampton County
• Williams/Lower Saucon/Bethlehem Townships: I-78 road work between Exit 60 and Exit 75, 9 a.m. to 2 p.m. Tuesday through Thursday.
• Lower Saucon Township, Williams Township, Bethlehem Township: I-78 shoulder work between Exit 60 and Exit 75, 9 a.m. to 2 p.m. on Tuesday.
• Lower Saucon Township, Williams Township, Bethlehem Township: I-78 road work between Exit 60 and Exit 75, 9 a.m. to 2 p.m. on Wednesday and Thursday.
• Lehigh Township, Route 248 road work between Timberline Road and county line, 9 a.m. to 2 p.m. Tuesday through Friday.
• Palmer/Plainfield, Route 33 shoulder work between Route 22 and Belfast exit, 9 a.m. to 2 p.m. Tuesday through Thursday.
Schuylkill County
• Frackville Borough/Saint Clair Borough, Route 61 intermittent lane and shoulder restriction for core boring work between Spruce Street and Terry Rich Blvd., 8 a.m. to 4 p.m. Tuesday through Feb. 11, 2022.
Stay safe today and use caution while driving after the snowstorm.