Log In


Reset Password

Road work this week

The Pennsylvania Department of Transportation announces the following road work this week, but be advised that road work schedules may change as needed during COVID-19 mitigation or due to changes in the weather:

Carbon County

• Kidder Township: Interstate 80 East road sign work between Exit 274 and Exit 277, 9 a.m. to 3 p.m. Tuesday through Friday; I-80 West road sign work between Exit 284 and Exit 277, 9 a.m. to 3 p.m. Tuesday through Friday.

• Franklin Township: Route 209 shoulder restrictions for road sign work between Cherry Hill Road and Wagner Street, 9 a.m. to 3 p.m. through Friday.

• Penn Forest Township: Route 903 road sign work between Butternut Road and Danner Road, 9 a.m. to 3 p.m. Tuesday through Friday.

• Banks Township: Cigar Plant Road drainage between Route 93 and Schuylkill County line, 7 a.m. to 3 p.m. Tuesday through Friday.

Lehigh County

• South Whitehall Township: Route 22 West road sign work between Cedar Crest Boulevard and Route 309, 9 a.m. to 3 p.m. Tuesday through Friday; Route 309 South road sign work between Ridgeview Drive and Route 22, 9 a.m. to 3 p.m. Tuesday through Friday.

• Upper Macungie, South Whitehall Township and Allentown: Route 22 construction between I-78 and 15th Street, 7 p.m. to 6 a.m. Tuesday through Friday.

• Upper Macungie Township: Route 22 East road sign work between I-78 and Tilghman Street, 9 a.m. to 3 p.m. Tuesday through Friday; I-78 road sign work between Exit 49 (Route 100) and Exit 51 (Route 22), 9 p.m. to 6 a.m. Tuesday through Friday.

• Upper Saucon Township: Lanark Road construction between Route 309 and Cumorah Avenue, 9 a.m. to 3 p.m. Tuesday through Friday; Route 309 North construction between Route 378 and Camp Meeting Road, 9 a.m. to 3 p.m. Tuesday through Friday.

• Allentown: Route 145 surveying between Emmaus Avenue and South 6th Street, 7:30 a.m. to 3 p.m. Tuesday through Friday; I-78 shoulder restriction between Exit 60 (Route 309) and Exit 49 (Route 100), 9 a.m. to 2 p.m. Tuesday through Friday; I-78 shoulder restriction between Exit 60 (Route 309) and Exit 49 (Route 100), 9 a.m. to 2 p.m. Tuesday through Friday; Seventh Street/Route 145 road closure between Hamilton Street and Linden Street: Road will be closed and detoured for Highway Occupancy Permit work. Detour will utilize Linden Street, Ninth Street, and Hamilton Street. 8 a.m. to 5 p.m. on Tuesday and Wednesday.

• Whitehall Township: Lehigh Street pothole patching between Route 145 and Fourth Street, 8 a.m. to 2 p.m. Tuesday through Friday.

Monroe County

• Stroudsburg Borough: I-80 East lane restrictions for drilling work between Exit 305 (Main Street) and Exit 307, 8 p.m. to 6 a.m. Tuesday through Friday.

• Stroudsburg Township: Cherry Lane Road lane restriction for mowing between Route 715 and Cherry Lane Road, 9 a.m. to 3 p.m. Tuesday and Friday; Cherry Lane Road lane restriction for edge line patching between Route 611 and Hallet Road, 9 a.m. to 3 p.m. on Friday; Route 611 crack sealing between Delaware Water Gap and Route 191, 8 p.m. to 6 a.m. Tuesday through Friday.

• Hamilton Township: Four-lane 209 pothole patching between Route 33 and Lesh Road, 9 a.m. to 3 p.m. Tuesday through Thursday.

• Multiple townships: Route 33 North crack sealing between Northampton County line and Saylorsburg, 9 a.m. to 3 p.m. Tuesday through Thursday.

Northampton County

• Lehigh Township: Blue Mountain Drive shoulder work/widening between Cashew Drive and Cork Road, 7 a.m. to 3 p.m. began June 28 and will continue until Aug. 27; Walnut Drive shoulder work/widening between Cherry Hill Road and Elm Drive, 9 a.m. to 2 p.m. on Thursday and Friday.

Schuylkill County

• North Manheim Township, Route 61 pothole patching between Schuylkill Haven and Pottsville City, 7 a.m. to 3 p.m. Tuesday through Friday.

• New Castle Township, Route 61 lane restriction between Frackville Borough and St. Clair Borough, 7 a.m. to 3 p.m. Tuesday through Friday.