Road work this week
The Pennsylvania Department of Transportation announces the following road work this week, but be advised that road work schedules may change as needed during COVID-19 mitigation or due to changes in the weather:
Carbon County
• Mahoning Township, Seneca Road shoulder work and widening between Route 443 and Route 902, 7 a.m. to 3 p.m. on Monday; Church Hill Road shoulder work/widening between Ben Salem Road and Fritz Valley Road, 7 a.m. to 3 p.m. on Thursday.
• Packer Township and Weatherly Borough: Packer Drive/West Main Street drainage between Route 93 and Plane Street, 7 a.m. to 3 p.m. on Monday.
Lehigh County
• Upper Macungie Township, Route 22 East inspection between I-78 and Turnpike, 9 a.m. to 3 p.m. on Tuesday; I-78 road sign work between Exit 49 (Route 100) and Exit 51 (Route 22), 9 p.m. to 6 a.m. Monday through Thursday; Route 22 West inspection between Turnpike and I-78, 9 a.m. to 3 p.m. on Wednesday.
• Allentown, Lehigh Street pothole patching between South Jefferson Street and Route 145/Union Street, 8 a.m. to 2 p.m. Monday through Friday.
• Whitehall and North Whitehall townships: Route 145 pothole patching between Schadt Avenue and Route 863, 8 a.m. to 2 p.m. Monday through Friday.
• Washington, Heidelberg and Lynn Townships: Mosserville/Mountain Road drainage between Route 143 and Route 873, 8 a.m. to 2 p.m. Monday through Friday.
• Upper Saucon Township, Lanark Road construction between Route 309 and Cumorah Avenue, 9 a.m. to 3 p.m. Monday through Thursday; Route 309 North construction between Route 378 and Camp Meeting Road, 9 a.m. to 3 p.m. Monday through Thursday.
• South Whitehall Township, Route 22 construction between I-78 and Route 309, 7 p.m. to 6 a.m. Monday through Friday; Route 22 bridge repair between Cedar Crest Boulevard and 15th Street, midnight to 4 a.m. on Wednesday.
Monroe County
• East Stroudsburg Borough, I-80 East inspection between Exit 307 and Exit 309, 9 a.m. to 3 p.m. on Wednesday.
• Tunkhannock Township, I-80 West crack sealing between Exit 293 and Exit 284, 9 a.m. to 3 p.m. on Monday and Tuesday.
• Hamilton, Smithfield and Stroud townships: Route 209 pothole patching between Route 33 and Route 209, 8 p.m. to 6 a.m. on Monday and Tuesday.
• Tobyhanna and Tunkhannock townships: I-80 West crack sealing between Exit 293 and Exit 284, 9 a.m. to 3 p.m. on Wednesday and Thursday.
• Multiple townships: Route 33 South crack sealing between Saylorsburg and Northampton County line, 9 a.m. to 3 p.m. on Thursday.
• Stroudsburg Township, I-80 restrictions for drilling work between Exit 305 (Main Street) and Exit 307, 8 p.m. to 6 a.m. Monday through Friday.
Schuylkill County
• Schuylkill Haven Borough, Route 443 paving between Berne Street and Route 61 (Pottsville Pike), 6 a.m. to 4 p.m. Monday through Thursday.
• West Mahanoy, Ryan, Blythe and New Castle townships: Route 61 pothole patching between Frackville Borough line and Saint Clair borough line, 7 a.m. to 3 p.m. Monday through Thursday.